Individuals have been receiving phone calls from people claiming to be a police officer or banking official. The suspect will say either: There has been fraudulent activity at the victims’ bank and the staff at the bank are involved. The victim is then asked to withdraw money to either keep it safe or assist the police with their investigation. A…
Mobile Vehicle Activated Sign Results – Feb-Mar 2019
The mobile speed signs placed around West Wickham and Streetly End advising and warning motorists of their speed also records their speeds to produce a series of statistics which are presented here.
Roadworks: Streetly End, 18-20 March 2019
Streetly End
ROADWORKS 18-20 Mar 2019 Cambridgeshire Highways
Section 184 – Dropped kerb installation.
Road Closure: The Common, West Wratting, 27-29 March 2019
Location Type Dates Reason Details The Common, West Wratting as lies between Common Road and Chapel Road. ROAD CLOSURE 27-29 Mar 2019 Cambridgeshire HighwaysCarriageway maintenance works Closure NoticeMore…
Roadworks: 39-47 High Street, 4-8 Mar 2019
The previously announced utility works for 4-6 March and 11-15th March have now been merged into one week with both Cambridge Water and UK Power Networks overlapping their work so as to reduce the time the road will be closed to 4-7 March only. As a result there will be no road closure 11-15 March.
Notice of hedge row coppice work – footpaths 21 and 29
Thurlow Estate will be performing some hedge row coppice work shortly along portions of footpaths 21 and 29 (see area marked in red). Strategic trees will be left along each side and if required gapping up of the hedge will occur once regrowth has been assessed.
Garden Wildlife caught on camera
Badgers, Muntjacs, Hares, Foxes, Squirrels, Birds and even domestic cats captured on video in a West Wickham back garden
Road Closure: 39-47 High Street, 11-15 Mar 2019
Update: The timing of this work has been brought forward to 6-8 March to coincide with the previously announced closure to minimise the period of disruption on the High Street. Location Type Dates Reason Details 39-47 High Street ROAD CLOSURE 11-15 Mar 2019 UK Power NetworksConnections Small Service:Installation of a new electricity supply for a customer:12m of trench in Grass…
Road Closure: 39-47 High Street, 4-6 Mar 2019
Update: The duration of the closure has been extended to 7 March to allow UK Power Networks to bring forward their work and so minimise the period of disruption on the High Street. Location Type Dates Reason Details 39-47 High Street ROAD CLOSURE 4-6 Mar 2019 Cambridge Water CompanyExcavate in CW, FW & Verge to connect new plot to existing…
Road Closure – Weston Colville, 21-25 Jan 2019
LocationType Dates Reason Details Lark Hall Corner Road, WESTON COLVILLEROAD CLOSURE 21-25 Jan 2019 UK Power -Installation of a new electricity supply for a customer. More…